How to use

Hand Mixing

Cement Mixer

  1. Open the Nolka Dried Pre-Mix sack and remove the poly bag containing the cement.

  2. Pour the aggregate from the sack on to a clean flat surface.

  3. Add the cement from the poly bag to the agregate.

  4. Using a shovel, mix the cement thoroughly with the aggregate.

  5. Form a pile with the resulting mix and make an indent in the middle of the pile capable of holding water.

  6. Pour a small amount of water into the indent.

  7. Mix in the pile from the sides into the indent containing the water.

  8. Gradually add more water to the Nolka Dried Pre-Mix thoroughly until the desired mix thickness is achieved. WARNING: Do not add too much water until you have decided how thick you want your premix to be.

  9. Use the concrete mix immediately after to avoid premature hardening.

  10. Allow 24 hours to harden.

  1. Open the Nolka Dried Pre-Mix sack and remove the poly bag containing the cement.

  2. Pour the aggregate from the sack into the cement mixer.

  3. Add the cement from the poly bag to the agregate into the mixer with the mixer rotating and ensure the dry cement and the aggregate have fully blended together.

  4. Add water into the mixer containing the Dried Pre-Mix slowly until the desired consistency of thickness is achieved. WARNING: Do not add too much water until you have decided how thick you want your premix to be.

  5. Use the concrete mix immediately after to avoid premature hardening.

  6. Allow 24 hours to harden.

*Always store Nolka Premix

bags in a dry area*

Below videos of hand mixing and simple home yard application

Nolka premix cement hand mixing